
The design and implementation process is discussed under three main headings: conceptcreation, project studies, and field application. The focal point of the project is to create an impressive space where design, comfort, and functionality come together.
When creating floor plans, an approach was adopted where each area is efficiently utilized, circulation spaces are designed with optimal solutions, and functional spaces are created. Working on ceiling and flooring plans, furniture arrangements, wet space details, electrical, and mechanical projects, problems related to the height of the suspended ceiling were solved.
While the basic color palette of the space designed as a gym consists of white and woodtones, a warm atmosphere was created with curved forms on the ceiling and walls. The designwas completed with green plants and hidden lighting elements. With simple materialselections, the design was strengthened with amorphous forms. Brand identity was reflectedby using the company’s colors, blue and navy tones, on the walls and movable furniture.
Effective cooling is required in sports facilities, so optimal air conditioning is provided usingconcealed ceiling type air conditioners. Fresh air is supplied into the salon with linear slot diffusers, while exhaust is performed with round grilles. This way, users exercising in thegym will not directly come into contact with cold air.
Hidden lighting is used indoors, providing the desired light level (300-350 lux) and adding a pleasant brightness to the environment.


